Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Color Sorter System

Home >  Products >  Plastic Recycling Machine >  Color Sorter System

Color Sorter System

The Color Sorter System is mainly used for the color classification of the same material, applicable to all kinds of sheet, block, granular plastic color sorting, with high color accuracy, high output, low noise, stable and reliable characteristics. Combined with material machine, 
it can be used for double sorting of material and color for non-black plastics such as PET bottle flakes and PE bottle caps. It is characterized by small footprint and stable performance.Output 300kg/h-3000kg/h, can be configured according to customer requirements.

Product Description

System configuration : 

Item 

Description 

1

Buffer Silo 

2

Bucket Elevator 

3

Color Sorter

4

Color Sorter Inlet Hopper 

5

Color Sorter Discharge Hopper 

6

Color Sorter Platform 

7

Horizontal Screw Conveyor

8

Vacuum Feeder

9

Silo

10

Color Sorter Electric Box 

Color Sorter System factory

Color Sorter System manufacture

Color Sorter System supplier

Color Sorter System manufacture

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search