Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Crushing Washing Sorting Line for Plastics

Home >  Products >  Plastic Recycling Machine >  Crushing Washing Sorting Line for Plastics

Crushing Washing Sorting Line for Waste Lead-Acid Batteries

A plastic crushing, washing, and sorting production line is used to process plastic produced  after the crushing, disassembly, and sorting of waste lead-acid batteries. This production line  features high color sorting purity, effective impurity separation, and low wastewater discharge.

The production capacity ranges from 1000kg/h to 4000kg/h and can be configured according to customer requirements.

  • High color sorting purity
  • Excellent impurity separation
  • Low wastewater discharge
Product Description

Crushing Washing Sorting Line for Waste Lead-Acid Batteries supplier

Crushing Washing Sorting Line for Waste Lead-Acid Batteries factory

Crushing Washing Sorting Line for Waste Lead-Acid Batteries supplier

Crushing Washing Sorting Line for Waste Lead-Acid Batteries details

Crushing Washing Sorting Line for Waste Lead-Acid Batteries supplier

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search