Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Plastic Extruding Pelletizing Line

Home >  Products >  Plastic Recycling Machine >  Plastic Extruding Pelletizing Line

Extruding String Cutting Pelletizing Line A

The extruding string cutting pelletizing line is mainly used for granulating LDPE, HDPE, PP,
ABS, PET and other recycled broken materials.
Production capacity: 100kg/h-1000kg/h
Product Description

Extruding String Cutting Pelletizing Line supplier

Extruding String Cutting Pelletizing Line manufacture

Extruding String Cutting Pelletizing Line supplier

Extruding String Cutting Pelletizing Line details

System configuration :
Item
 Description
1
Auto Feeder
2
Forced Feeder
3
Extruder, Single Stage or Mother-Baby Two Stage , with Hydraulic Screen Changer
4
Water Cooling Trough
5
Water Bounce Machine
6
Blow Dryer
7
Cutting Unit
8
Vibrosieve
9
Blowing Conveyer and Silo
10
Electric Control Cabinet

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search