Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Plastic Extruding Pelletizing Line

Home >  Products >  Plastic Recycling Machine >  Plastic Extruding Pelletizing Line

Extruding String Cutting Pelletizing Line

The extruding string cutting pelletizing line is mainly used for granulating LDPE, HDPE, PP,
ABS, PET and other recycled broken materials.
Production capacity: 100kg/h-1000kg/h
Product Description

Extruding String Cutting Pelletizing Line supplier

Extruding String Cutting Pelletizing Line manufacture

Extruding String Cutting Pelletizing Line supplier

Extruding String Cutting Pelletizing Line details

System configuration :
Item
 Description
1
Auto Feeder
2
Forced Feeder
3
Extruder, Single Stage or Mother-Baby Two Stage , with Hydraulic Screen Changer
4
Water Cooling Trough
5
Water Bounce Machine
6
Blow Dryer
7
Cutting Unit
8
Vibrosieve
9
Blowing Conveyer and Silo
10
Electric Control Cabinet

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search