Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Loader & Charger

Home >  Products >  Plastic Auxiliary Machine >  Loader & Charger

HZS Series Vacuum Loader for Power Material

This machine adopts the principle of negative pressure vacuum gas transportation, featuring
a 304 stainless steel cylinder, an internal coated dust removal bag, an external pulse back - blowing airbag, and a high-vacuum Roots vacuum pump for evacuation. It is suitable for the transportation of powder and granular materials.
Characteristics: large material conveying capacity, long conveying distance, effective dust prevention, compact structure, and easy installation.

Product Description

HZS Series Vacuum Loader for Power Material manufacture

 

Model

 

Max.

Capacity(kg/h)

 

Tank Volume

L)

Pipeline requirements

 

Vacuum

Pump

Power(kW)

Capacity

of

Feeding

Station(L)

Feed Height

H(m)

Distance

HZS-1

500

50~100

9

30-50

3

250

HZS-2

800

100~250

9

30-50

4~5.5

250

HZS-3

1500

250~400

9

30-50

5.5~7.5

250

HZS-4

3000

400~1000

9

30-50

7.5~15

250

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search