Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Plastic Pipe Extrusion Production Line

Home >  Products >  Plastic Extrusion Machine >  Plastic Pipe Extrusion Production Line

PPR Pipe Production Line

Efficient PPR single and double pipe production lines are widely used in the manufacturing of water supply and drainage pipes for urban apartments and rural areas.
These production lines are specifically designed for PPR pipe manufacturing, utilizing high - efficiency single-screw extruders and equipped with Siemens PLC automatic control systems to achieve high output and extrusion stability. Additionally, by modifying the configuration units, the production lines can be adapted for the manufacturing of PE-RT, PEX, and PB pipes.

Product Description

PPR Pipe Production Line details

PPR Pipe Production Line factory

PPR Pipe Production Line details

PPR Pipe Production Line manufacture

PPR Pipe Production Line supplier

Model

Pipe Dia,

Extruder

Max. Capacity

(kg/h)

Extruder Power

(kW)

PPR/HDPE-63  Single

ø20-ø63

65/33

120-150

55

PPR/HDPE-63

Dual-Strand

ø20-ø63

65/38

180-270

90

PPR/HDPE-125   Single

ø75-ø125

65/38

180-270

90

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search