Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

PVC Pulverizer

Home >  Products >  Plastic Auxiliary Machine >  PVC Pulverizer

PVC Pulverizer

The SMP-390 pulverizer is a series of high-speed vortex multi-purpose pulverizers developed by our factory, absorbing advanced foreign technology. This equipment is used for fine pulverization in industries such as plastics, mining, chemicals, and metallurgy. It is especially suitable for grinding recycled thermoplastic PVC granules. Practical operation in professional plastic product factories has demonstrated that adding 20%-30% of the ground powder to the processing formula retains the chemical and physical properties of the product, consistent with those of new materials. Therefore, it is the optimal equipment for plastic product factories to reduce costs and solve the problem of waste accumulation.

Product Description

PVC Pulverizer details

Breaking Room Inner Dia.

390

Rotor Amount

3

Main Shaft Rotate Speed

3400-3700

Motor Power

30

Breaking Amount

50-150

 

Outside Dimension(mm)

1250x1500x1530 Machine Body

1000x1000x1015  Dust Collecting Hopper

Weight(kg)

1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search