Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

SH Series Ribbon Mixer

Home >  Products >  Plastic Mixing Machine >  SH Series Ribbon Mixer

SH-A Series Ribbon Mixer

Applied for mixing and coloring of plastic pellets, powders, masterbatches, as well as various new materials and waste materials.
Stainless steel barrel manufacturing, with overall surface paint treatment.
Propeller blades adopt a double ribbon structure.
Reliable installation to ensure worker safety.
Equipped with a 0-30 minutes automatic shutdown system.

Product Description

240829-1.jpg

240829-3.jpg

240829-4.jpg

Inside

Model Motor[kw] Mixing Capacity[kg/h] Rotating Speed [r/min] (Optional)
Electric
Heater[kW]
Dimensions (mm)
SH-A-H200 3 240 32 6 1600x680x1200
SH-A-H300 3 360 32 6 1850x680x1200
SH-A-H400 4 480 32 9 1650x880x1460
SH-A-H500 5.5 600 29 9 1850x880x1500
SH-A-H600 5.5 800 29 9 2050x880x1500
SH-A-H1000 11 1050 23 18 2900x1360x2100
SH-A-H2000 15 2100 23 24 3300x1660x2500
SH-A-H3000 22 3000 23 24 3780x1910x2700
SH-A-H6000 45 4200 19 36 4880x2250x2800
SH-A-H12000 75 8000 19 42 5980x2250x2900

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search