Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Crusher & Shredder

Home >  Products >  Plastic Recycling Machine >  Crusher & Shredder

Shredding & Cutting Combination Machine

Shredder, crusher/grinder and storage system combined into one machine, save space and cost.
Material  strength  will  decrease  sharply  after  shredding,  lower  crusher  stress  while improve knife service life.
Suitable for all kinds solid plastics, such as pipes, lumps, hollow vessel etc.
Total machine is controlled by a set Siemens PLC system, machine realize stable and safe working by automatic control of shredder, crusher and storage efficiency.

Product Description

Shredding & Cutting Combination Machine factory

Shredding & Cutting Combination Machine factory

Model

SP-2260

SP-3980

Shredder Motor(kW)

22

37

Shredder Moving Knife (pcs)

26

39

Shredder Fixed Knife (pcs)

1

1

Crusher Motor(kW)

15

22

Crusher Moving Knife (pcs)

18

21

Crusher Fixed Knife (pcs)

4

4

Blower Motor(kW)

4.0

5.5

Max. Capacity(kg/h)

500

700

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search