Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

STG-U Series Hopper Plastic Dryer

Used for drying and dehumidifying plastic pellets, with energy savings of 27-65%

Can be directly connected to the main machine's feed inlet, avoiding the reabsorption of moisture by dried plastic pellets

Features high-efficiency drying capabilities, increasing injection rates

Improves the quality of the finished products

Product Description

Main Technical Parameters

 Model

Volume(L)

Feeding Amount(kg)

Power(kW)

Dimensions(mm)

Weight(kg)

STG-U25

25

15

1.8

0.06

705x320x1015

32

STG-U40

40

25

2.6

0.06

800x370x1050

50

STG-U80

80

50

3.9

0.12

850x460x1100

60

STG-U125

125

75

4.8

0.12

950x530x1200

75

STG-U160

160

100

5.4

0.25

1650x650x1650

90

STG-U250

250

150

9

0.37

1720x720x1950

110

STG-U315

315

200

12

0.37

1800x800x1950

135

STG-U400

400

250

15

0.55

1850x820x1950

200

STG-U500

500

300

18

0.55

2000x850x2200

240

STG-U800

800

500

24

0.75

2200x1100x400

300

STG-U1250

1250

800

36

0.75

2725x1200x3425

500

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search